MetalZorb for Stormwater Treatment

U.S. Northeast Region Case Study

 

Site information:

  • High stormwater runoff concentrations of both suspended and dissolved metals
  • Large industrial facility with approx. 40 inches of annual rainfall

    3rd Party Testing with stormwater samples:

    • Initial RCRA-8 testing to quantify heavy metals in runoff
    • Specially designed bench scale testing system used to mimic field MetalZorb catchment system
    • CleanWay USA systems tested:
      • Geotextile fabric + MetalZorb
      • Absorb-it + MetalZorb
    • Collection and testing of filtered stormwater over an extended period of time to
      confirm filter longevity

     

    Conclusion:

    • CleanWay USA products successfully reduced the total suspended solids and dissolved metals to below regulatory limits.
    Testimonials

    What Customers Say

    Installation took less than 30 minutes and met our permit requirements on the first inspection.

    Municipal Engineer

    City of Portland

    Cleanway dramatically reduced dissolved metals in our discharge. Compliance reports speak for themselves.

    Industrial Facility Manager

    Steel Fabricator

    CleanWay’s technical team helped us spec the right system for a complex retrofit. Outstanding support.

    Environmental Consultant

    ENV Group