Oregon Wire Products [zinc]

Oregon Wire Products

PROJECT REQUIREMENTS

Meet or exceed Oregon Department of Environmental Quality stormwater permit benchmark for zinc using existing drainage infrastructure and adapting passive filtration methods.

PERMIT REQUIREMENTS

Reduce total zinc at sample point to a geometric mean of <0.24 mg/L over 4 consecutive sample events.

SITE CHARACTERISTICS

Approximately 2.4 acres of totally impervious surface of which about half consists of buildings with a mixture of metal and composite roofs. Buildings have galvanized gutters and downspouts connecting to main storm drainage pipe through cast iron underground pipelines. The remainder of the site is paved with asphalt and includes four concrete loading docks. A total of seven catch basins drain the paved area with each loading dock having one catch basin at its lowest point. All catch basins are connected to the same main drainage pipe and a sampling manhole has been installed at the edge of the property. All the roof runoff and the pavement drains connect upstream of the sample manhole and the combined flow is analyzed and the result submitted to the permit regulatory agency.

SITE HISTORY

Company management had implemented a program of frequent parking lot sweeping and pressure washing of roofs and gutters along with moving all identifiable zinc sources under cover. They also deployed non woven fabric catch basin filters throughout the site. These measures brought the levels of suspended solids down to acceptable limits but left the zinc levels at >5.0 mg/L. Beginning in March, they replaced the non woven fabric filters with CleanWay® catch basin filters and in February, began to install  in the catch basins which showed the highest concentration of zinc.

 

SUCCESSFUL CONCLUSION

Through adapting a strategy of adding MetalZorb where zinc was highest, coating one of the metal roofs and keeping to an adaptive maintenance schedule, the permit requirement of four consecutive samples with an average zinc content of <0.24 mg/L has been met and a waiver of further testing in the remaining permit cycle has been achieved. For more information, call 800.723.1373.

Testimonials

What Customers Say

Installation took less than 30 minutes and met our permit requirements on the first inspection.

Municipal Engineer

City of Portland

Cleanway dramatically reduced dissolved metals in our discharge. Compliance reports speak for themselves.

Industrial Facility Manager

Steel Fabricator

CleanWay’s technical team helped us spec the right system for a complex retrofit. Outstanding support.

Environmental Consultant

ENV Group